Restauration of Diema DS-28 DFKM locomotive 23
The locomotive was technically and visually in a poor condition. The club therefore decided to carry out the following work.
Technical work on the locomotive:
- The shift fork for third gear was worn out. The problem was solved by reversing the fork
- A thorough service was carried out on the engine. The oil was changed and all filters and the drive belt for the alternator were replaced.
- The rag joint was very worn and had to be replaced with a new joint
Optical works
- The locomotive was completely dismantled.
- The old paint has been completely sanded off
- The larger dents were removed
- The bonnet and driver's cab were straightened
- Several holes in the driver's cab and a considerably large hole in the bonnet were closed
- The locomotive was repainted to match the livery of the DR's LKM V15
- Blue for the body and front of the frames
- White trim strip
- Wheels and frame in black
- The interior was painted in light grey.
- The labelling was applied at the end
The restoration required around 250 hours of work. These were completed during the 2024 works week. The locomotive can now be used again in its new look as a shunting locomotive in Lütjenkamp.
The locomotive was on display for visitors and friends of the museum on Open Monument Day in September 2024.